問答題【問題5】(2分)根據(jù)你的理解,請(qǐng)指出該項(xiàng)目的主要風(fēng)險(xiǎn)。

你可能感興趣的試題

6.單項(xiàng)選擇題

( )can be considered as part of risk mitigation.
 

A. Risk identification
B. Purchasing insurance
C. Assessment of outcomes
D. Assessment of probabilities

7.單項(xiàng)選擇題

( )is not the advantage of GERT (Graphical evaluation and review techniques)as compared with PERT (project evaluation and review techniques).
 

A. Allowing looping
B. Allowing for dummy tasks
C. Allowing branching
D. Allowing multiple project end results

8.單項(xiàng)選擇題

The length of the IPv6 address is ( ).
 

A. 64 bytes
B. 128 bytes
C. 64 bits
D. 128 bits

10.單項(xiàng)選擇題以下關(guān)于變更的流程和規(guī)則的做法中,()是錯(cuò)誤的

A、以口頭方式提出某項(xiàng)變更,在評(píng)估前針對(duì)該變更提交了書面報(bào)告XXX
B、項(xiàng)目組成員變更以郵件發(fā)出,在評(píng)審前填寫了變更申請(qǐng)
C、為了規(guī)范,監(jiān)理不對(duì)變更進(jìn)行分級(jí),所有變更流程都不能簡化
D、按照影響范圍、緊急程度吧變更分為3個(gè)優(yōu)先級(jí)別

最新試題

項(xiàng)目管理的過程管理和功能管理(知識(shí)領(lǐng)域)的關(guān)系是:()

題型:單項(xiàng)選擇題

你是某公司網(wǎng)絡(luò)布線項(xiàng)目的項(xiàng)目經(jīng)理。你的班子成員包括六位全職雇員和三位承包商。他們都是第一次共同工作。你知道班子建設(shè)的步驟將按以順序進(jìn)行:()

題型:單項(xiàng)選擇題

范圍核實(shí)將:()

題型:單項(xiàng)選擇題

以下都是不良的小組合作情況,除了:()

題型:單項(xiàng)選擇題

項(xiàng)目經(jīng)理、利害關(guān)系者和項(xiàng)目班子成員在整個(gè)項(xiàng)目階段都承擔(dān)著職責(zé)。作為項(xiàng)目經(jīng)理,你可以將項(xiàng)目范圍與項(xiàng)目的角色掛鉤,說明哪些活動(dòng)由哪些人參與,你可以用以下何種方式來描述這些信息。()

題型:單項(xiàng)選擇題

你知道變更控制系統(tǒng)很重要,因?yàn)樗鼈兠枋隽巳绾翁峤蛔兏?qǐng)求并且記錄了如何管理變更、跟蹤變更的狀態(tài)和確定變更的管理影響。在控制過程組中下列哪個(gè)過程沒有運(yùn)用變更控制系統(tǒng)作為工具和技術(shù):()

題型:單項(xiàng)選擇題

WBS之所以成為范圍變化控制的一個(gè)輸入量是因?yàn)椋海ǎ?/p>

題型:單項(xiàng)選擇題

為了評(píng)估因趕工對(duì)項(xiàng)目可能造成的影響,項(xiàng)目經(jīng)理首先應(yīng)該計(jì)算:()

題型:單項(xiàng)選擇題

在合同談判中,廠商告訴你在征求建議書最初參與投標(biāo)的設(shè)備已經(jīng)不再生產(chǎn)了。他們說最好的解決方法是購買他們所提供的新設(shè)備,價(jià)錢比原來的要高。你所擔(dān)心的是新設(shè)備可能和現(xiàn)有的設(shè)備不兼容,并嘗試與他們討論該問題。但他們提醒你,這個(gè)決定是上次合同談判會(huì)確定的,所以沒有必要繼續(xù)討論該問題。這是以下哪項(xiàng)的例子?()

題型:單項(xiàng)選擇題

工作A悲觀估計(jì)需要36天完成,很有可能21天完成,樂觀估計(jì)只用6天完成,那么工作A從16天到26天之間完成的可能性是()

題型:單項(xiàng)選擇題