單項選擇題In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()

A.The safety valve escape piping should be disconnected from the valve body and a blank inserted
B.The boiler vent valves should be opened
C.All handhole/manhole covers should be tightened up as much as possible to preclude any leaks
D.All of the above


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題The fuel supply system to an automatic auxiliary boiler, will be automatically shutdown if the boiler ()

A.salinity is abnormally high
B.steam demand is too high
C.water level is abnormally low
D.feedwater flow is low

2.單項選擇題Lubricating oil is supplied to the crank-pin bearings in a marine diesel engine by ().

A.internal crankshaft passages
B.immersion in oil
C.splash lubrication
D.injection lubrication

3.單項選擇題What function is provided by the crankcase ventilation system on some diesel engines?()

A.Increases the sludge forming tendency of lube oil
B.Prevents the accumulation of combustible gases
C.Improves lube oil cooling
D.Improves cold weather starting

4.單項選擇題Increasing the valve clearance between a valve stem and rocker arm, will result in the valve ()

A.closing later
B.opening sooner
C.staying open for a shorter period of time
D.staying open for a longer period of time

5.單項選擇題A diesel engine crankcase ventilation system ()

A.prevents spark generation
B.removes combustible gases
C.determines the level of combustible gases
D.provides inert gas generation in crankcase