A.ship surveyor's report
B.a ship's certificate
C.a cargo inspection report
D.a diver survey report
您可能感興趣的試卷
你可能感興趣的試題
A.the Coast Guard
B.the ABS
C.the shipyard fire department
D.a certified marine chemist
A.holding angle
B.fleet angle
C.fluke angle
D.shank angle
A.the remind of the master
B.the refer of the master
C.the render of the master
D.the request of the master
A.it
B.this
C.that
D.what
A.at the discretion of the inspector,but in no greater detail than required for original certification
B.at the discretion of the inspector,but in no lesser detail than required for original certification
C.generally similar in scope to the inspection required for certification,but in less detail
D.equivalent to the inspection required for certification
A.Certificate of Inspection
B.Classification Certificate
C.Load Line Certificate
D.Seaworthy Certificate
A.Tearing through the member is more likely in this type connection
B.The weld may be broken by the stresses caused by riveting
C.The weld increases the tensile stress on the rivet heads
D.The welding must be completed before the riveting commences
A.penetrations
B.plating
C.framing
D.brackets
A.to windward should be opened and the ones to leeward should be closed
B.to leeward should be opened and the ones to windward should be closed
C.should be opened
D.should be closed
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
最新試題
Please arrange()a surveyor to inspect the damaged bulkhead.
Connecting elements of a mooring system should be fabricated from().
Prior to burning or welding on a fuel tank on a ship,regulations require that an inspection be made. An entry in the unofficial logbook is required if this inspection is made by().
In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead().
The boom stops are installed on an offshore crane to().
Cracks may be prevented from developing at the corners of welded plating inserts by().
Chain slings are suitable for heavy slender articles,such as().
The burden of proving unseaworthiness is upon those who()it.
At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().
Chafing gear().