單項選擇題Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.

A.necessity
B.responsibility
C.requirement
D.stipulation


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題During fueling,all doors,hatches,and ports().

A.to windward should be opened and the ones to leeward should be closed
B.to leeward should be opened and the ones to windward should be closed
C.should be opened
D.should be closed

2.單項選擇題Cracks may be prevented from developing at the corners of welded plating inserts by().

A.squaring the corners
B.rounding the corners
C.plug welding the corners
D.slot welding the corners

3.單項選擇題Connecting elements of a mooring system should be fabricated from().

A.cast iron
B.forged steel
C.stainless steel
D.cast steel

4.單項選擇題Chain slings are suitable for heavy slender articles,such as().

A.timber or steel rails
B.locomotives or boilers
C.railway passenger coaches
D.motor vehicles

5.單項選擇題Chafing gear().

A.reduces and prevents corrosion of standing rigging
B.prevents corrosion of running rigging
C.reduces and prevents wear caused by the rubbing of one object against another
D.protects the body against extreme cold