A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
您可能感興趣的試卷
你可能感興趣的試題
A.penetrations
B.plating
C.framing
D.brackets
A.examine
B.to examine
C.being examined
D.examining
A.necessity
B.responsibility
C.requirement
D.stipulation
A.to windward should be opened and the ones to leeward should be closed
B.to leeward should be opened and the ones to windward should be closed
C.should be opened
D.should be closed
A.squaring the corners
B.rounding the corners
C.plug welding the corners
D.slot welding the corners
最新試題
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
At()an occasional survey has been carried out.
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
Before welding can be done in a tank that has carried petroleum products,a certificate must be obtained from().
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.
Before welding in a tank that has carried petroleum products,the tank must be certified by ().
Chain slings are suitable for heavy slender articles,such as().
Please arrange the survey()early.
Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.
The conclusion is()the said ship is fit to continue to sail.