A.to
B.of
C.for
D.about
您可能感興趣的試卷
你可能感興趣的試題
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
A.examine
B.to examine
C.being examined
D.examining
A.necessity
B.responsibility
C.requirement
D.stipulation
最新試題
Cracks may be prevented from developing at the corners of welded plating inserts by().
Please arrange()a surveyor to inspect the damaged bulkhead.
The anchors on the bow are known as().
The angle between the flukes and the shank of an anchor is called the().
Connecting elements of a mooring system should be fabricated from().
The angle at which the anchor flukes penetrate the soil is the().
Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()
Before welding in a tank that has carried petroleum products,the tank must be certified by ().
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().