A.of
B.for
C.with
D.in
您可能感興趣的試卷
你可能感興趣的試題
A.18 months
B.2 years
C.3 years
D.5 years
A.to
B.of
C.for
D.about
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
最新試題
Let’s submit the case() the cargo surveyor.
Chain slings are suitable for heavy slender articles,such as().
The bottom of the mast rests on a part of the keel called the mast().
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
Connecting elements of a mooring system should be fabricated from().
Cracks may be prevented from developing at the corners of welded plating inserts by().
The anchors on the bow are known as().
Please arrange the survey()early.
I saw the cargo surveyor()the cargo on deck just a minute ago.
The document on a vessel,annually endorsed by an American Bureau of Shipping surveyor,is called the().