A.to be carried out
B.carry out
C.be carried out
D.will carry out
您可能感興趣的試卷
你可能感興趣的試題
A.of
B.for
C.with
D.in
A.18 months
B.2 years
C.3 years
D.5 years
A.to
B.of
C.for
D.about
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
最新試題
The angle between the flukes and the shank of an anchor is called the().
The boom stops are installed on an offshore crane to().
Chain slings are suitable for heavy slender articles,such as().
Let’s submit the case() the cargo surveyor.
The annual survey for endorsement of a Load Line Certificate must be held within().
At the same time,it is()for you to signify your acknowledgement of the responsibility for the collision by signing the copies of this letter hereto attached and to return me two copies in due time.
The anchors on the bow are known as().
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
The angle at which the anchor flukes penetrate the soil is the().
Chafing gear().