A.a marine chemist
B.the Officer in Charge,Marine Inspection
C.the Master or person in charge of the ship
D.the National Fire Protection Association
您可能感興趣的試卷
你可能感興趣的試題
A.to be carried out
B.carry out
C.be carried out
D.will carry out
A.of
B.for
C.with
D.in
A.18 months
B.2 years
C.3 years
D.5 years
A.to
B.of
C.for
D.about
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
最新試題
During fueling,all doors,hatches,and ports().
Please arrange()a surveyor to inspect the damaged bulkhead.
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
Let’s submit the case() the cargo surveyor.
The end of the joint with the exterior threads is called the().
Cracks may be prevented from developing at the corners of welded plating inserts by().
The smallest size of flaw that can be detected on a radiograph examination of a weld will be indicated by the().
Tensile stress is a result of two forces acting in().
Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()
At()an occasional survey has been carried out.