單項(xiàng)選擇題The boom stops are installed on an offshore crane to().

A.prevent the boom from being raised too high
B.prevent the boom from swinging
C.support the boom when not in use
D.prevent the boom from being lowered


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題The annual survey for endorsement of a Load Line Certificate must be held within().

A.the three month period immediately following the certificate's anniversary date
B.the three month period immediately preceding the certificate's anniversary date
C.three months either way of the certificate's anniversary date
D.the three month period centered on the certificate's anniversary date

2.單項(xiàng)選擇題The angle between the flukes and the shank of an anchor is called the().

A.holding angle
B.fleet angle
C.fluke angle
D.shank angle

3.單項(xiàng)選擇題The angle at which the anchor flukes penetrate the soil is the().

A.burial angle
B.penetration angle
C.fluke angle
D.holding angle

4.單項(xiàng)選擇題The anchors on the bow are known as().

A.bower anchors
B.kedge anchors
C.spare anchors
D.stream anchors