A.remove an existing list that would slow down cargo operations
B.initiate loading in conjunction with unloading at the hatch
C.improve stability during cargo operations
D.allow longshoremen easy access to the hatch
您可能感興趣的試卷
你可能感興趣的試題
A.Shipping Articles
B.Traveling Curio Manifest
C.Official Logbook
D.Cargo Gear Register
A.water in the tanks or pipelines
B.having the cargo too cool
C.explosion of vapors after discharge
D.inadequate ullage space
A.turn into the seas
B.turn to be parallel to the seas
C.reduce speed
D.increase speed
A.all decks intended for the stowage of vehicles are,in so far as is practicable,free from oil and grease
B.the ship has on board an adequate supply of cargo securing gear,which is maintained in sound working condition
C.vehicles are in apparent good order and condition suitable for sea transport,particularly with regards to securing
D.All of the above
A.weld pad eyes on deck in proper position to secure the cargo
B.strengthen the main deck by placing pillars underneath it in the tween-decks
C.distribute the weight of the cargo by placing fore-and-aft planks on the main deck
D.package the cargo in wooden crates so it will not damage the deck
最新試題
Which is a negotiable document? ()
When considering a vessel’s stability,which spaces in a general cargo vessel are the best locations for the carriage of bulk grain? ()
Which element(s) should be taken into account in the preparation of the “Cargo Securing Manual”?()
The system of valves and cargo lines in the bottom piping network of a tank vessel that connects one section of cargo tanks to another section is called a().
When clearing customs for a foreign voyage,which of the following is processed at the custom’s house and returned to the vessel? ()
When cargo aboard a jack-up in transit becomes adrift,the tow vessel should be asked to ().
Which method is used to supply inert gas from a flue gas system to the cargo tanks?()
The purpose of inert gas systems aboard tank vessels is to().
The number of rowing oars that must be carried in a motor-propelled open lifeboat on a cargo vessel is().
When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to().