A.The Chief Mate and Master of a container ship should have the proposed stowage plan ready for the stevedore upon arrival in port
B.When stowed on deck of a break bulk ship,the bottom of the container must be evenly supported throughout
C.With tiered containers,a 40-foot container may be stowed on top of two 20-foot containers
D.Deck load calculations must take into account the square footage of the entire container bottom
您可能感興趣的試卷
你可能感興趣的試題
A.not to affect the draught trim
B.not to affect the cargo ventilation
C.not to affect the free surface
D.not to affect the vessel's stability
最新試題
By regulation,your cargo vessel must have().
The Chief Checker reminded the Chief Officer()the dried turnips on top of the turpentine.
It is the responsibility of the Master or person in charge of a ship to ensure that().
Chief officer,I have()things to tell you.
Masters are required to notify Port Authorities of anchorage bearings after().
Before sailing,mariners on duty shall check the headings of magnetic compass by comparison with().
No person whose license has been revoked shall be issued another license except upon().
Even in the absence of express instructions,the authority of the master of a ship is very large and()to all acts that are usual and necessary for the employment of the ship.
No person may serve as the person in charge of both the vessel and the facility during oil transfer operations unless().
In terms of vessel manning,a watch is the().