單項(xiàng)選擇題()is not within the exception of the perils of the sea.

A.Stranding on rocks during fog
B.Fire at sea
C.Rough sea beating into a ship
D.The decaying of the cargo


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題The object of the both-to-blame collision clause is().

A.to free the carrying ship from liability
B.to free the non-carrying ship from liability
C.to free the ship in the wrong from liability
D.to free the ship not to blame from liability

5.單項(xiàng)選擇題When the Captain of the Port or Officer in Charge,Marine Inspection issues an order of suspension to the operator of a vessel concerning oil transfer operations,it().

A.is always effective immediately
B.includes a statement of each condition requiring corrective action
C.must be in writing before it takes effect
D.All of the above

7.單項(xiàng)選擇題Freight rates are mostly charged().

A.by the weight (tons) of cargo
B.by the capacity (tons) of vessel
C.by DW of the vessel
D.by the draft of the vessel

8.單項(xiàng)選擇題Where a propeller shaft passes through the hull,water is prevented from entering by means of a().

A.stuffing box
B.propeller boss
C.seacock
D.stop-water

9.單項(xiàng)選擇題If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().

A.broken space
B.dead weight
C.constant
D.dead freight

10.單項(xiàng)選擇題If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.

A.be responsible
B.not be responsible
C.pay the Shipowner for the expenses incurred
D.not claim the Shipowner for the expenses incurred

最新試題

The carrier can obtain()for loss caused to him by the shipper stating the particulars of the goods inaccurately.

題型:單項(xiàng)選擇題

A charter-party usually contains a clause stating that the master is to be under the orders of the()as regards employment,agency or other arrangements.

題型:單項(xiàng)選擇題

The carrier is entitled to limit his liability to the stated sum per package or unit even if he failed to exercise due diligence to make the vessel().

題型:單項(xiàng)選擇題

A breach of the()undertaking of seaworthiness at the port of loading entitles the Charterer to refuse to load.

題型:單項(xiàng)選擇題

()the Charterer seeks to say that the contract has been frustrated or that there has been an anticipatory breach which entitles him to rescind,then he has such rights as are given him at common law.

題型:單項(xiàng)選擇題

The object of the both-to-blame collision clause is().

題型:單項(xiàng)選擇題

If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.

題型:單項(xiàng)選擇題

If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().

題型:單項(xiàng)選擇題

Delivery of a vessel to a charterer is called().

題型:單項(xiàng)選擇題

The merchant shall have the goods properly()and accurately and clearly()before shipment.

題型:單項(xiàng)選擇題