單項選擇題In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()

A.The safety valve escape piping should be disconnected from the valve body and a blank inserted
B.The boiler vent valves should be opened
C.All hand-hole/manhole covers should be tightened up as much as possible to preclude any leaks
D.All of the above


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題() should be tested and adjusted when the boiler survey is carried out.

A.The boiler oil tank
B.The steam pipe
C.The fire side
D.The safety valves

2.單項選擇題Foaming in the steam drum may be caused by () in a boiler.

A.oxygen in the water
B.poor boiler design
C.density too high
D.excessive steam demand

3.單項選擇題Too much air in the furnace of an oil-fired boiler would be indicated by ().

A.yellowish flame
B.golden yellow flame
C.white flame
D.brilliant white flame

4.單項選擇題The feed water to the boiler will comprise ().

A.condensate
B.a small amount of make-up feed
C.A and B
D.None of the above

5.單項選擇題Proper combustion in a boiler would be indicated by ().

A.yellowish flame
B.golden yellow flame
C.white flame
D.brilliant white flame