A.pressing and urgent
B.impetuous
C.persecuted
D.outright and definite
您可能感興趣的試卷
你可能感興趣的試題
A.not indemnify the Buyers
B.indemnify the Buyers
C.not compensate the Sellers
D.compensate the Sellers
A.Buyers
B.Sellers
C.either the Buyers or the Sellers
D.neither the Buyers no the Sellers
A.insurance
B.sales
C.bill of lading
D.charter party
A.our ship is not responsible for trimming and stowing
B.our ship is responsible for trimming and stowing
C.our ship is responsible for expenses
D.our ship is not responsible for expenses
A.joint account
B.separate account
C.unique account
D.proper charter
最新試題
A traffic separation zone is that part of a traffic separation scheme which().
A swift current occurring in a narrow passage connecting two large bodies of water,which is produced by the continuously changing difference in height of tide at the two ends of the passage,is called a().
A tug is best positioned for towing and maneuvering on rivers and other restricted waters where wave action is limited when().
A strong,often violent,northerly wind occurring on the Pacific coast of Mexico,particularly during the colder months,is called().
A tow can override its tug as a result of().
A storm’s track is characterized by all of the following except().
A tug is “in irons” when held in a fixed position by()
A sufficient amount of chain must be veered when anchoring a vessel to ensure().
A towing vessel’s fire detection system may be certified to comply with the Coast Guard’s towing vessel fire protection regulations by().
A stage should only be rigged().