A.make-up
B.desired value
C.deviation
D.set value
您可能感興趣的試卷
你可能感興趣的試題
A.the bridge officer on watch
B.the chief engineer
C.the duty engineer
D.the duty motorman
A.open
B.open front type
C.live front type
D.None of the above
A.alternator
B.glass thermometer
C.burdon tube
D.piezoelectric pressure transducer
A.the system is manned manually
B.the system is situated remotely from the operator
C.the system is controlled automatically
D.all the above
A.the capstan
B.the collector
C.the panels
D.the surface
最新試題
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
() is not installed on the main switchboar.
Flame failure in an automatically fired auxiliary boiler can from a/an ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Which of the following items don’t belong to dock repair works?()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()