A.An alternator
B.An electric motor
C.A diesel engine
D.A main switchboard
您可能感興趣的試卷
你可能感興趣的試題
A.Cooling system
B.Alarm system
C.The air conditioning installation
D.The mooring equipment
A.pressure
B.velocity
C.flow rate
D.temperature
A.permissibly
B.permissible
C.no permissible
D.not permissible
A.along
B.will
C.throughout
D.for
A.an alternating
B.a rush
C.a direct
D.an exciting
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The shipboard oil pollution emergency plan will be invalid after ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The main purpose of port State control is not to()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Using a file without a handle may result in ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Which of the following items don’t belong to dock repair works?()
The cetane rating of diesel fuel is an indication of the ()