A.short proof
B.ground proof
C.explosion proof
D.overload proof
您可能感興趣的試卷
你可能感興趣的試題
A.AC
B.DC
C.generator
D.fresh water generator
A.AC voltage to the armature
B.AC voltage to the field
C.DC voltage to the armature
D.DC voltage to the field
A.wash it with fresh water and apply an external source of heat
B.renew the windings
C.send it ashore to an approved service facility
D.rinse all electrical parts with a carbon tetrachloride cleaning solvent and then blow dry the motor with compressed air
A.the recommended current and voltage rating
B.higher current and voltage rating
C.higher current and lower voltage rating
D.lower current and higher voltage rating
A.prime mover governor
B.exciter generator
C.voltage regulator
D.reverse power relay
最新試題
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Using a file without a handle may result in ()
Which of the following items don’t belong to dock repair works?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()