A.replace all bearings regardless of length of service
B.apply a heavy coat of oil to all mating surfaces
C.clean any corroded surfaces and file all burrs smooth
D.coat all parts with alemite grease
您可能感興趣的試卷
你可能感興趣的試題
A.Peak value
B.Root-mean-square value
C.Average value
D.Maximum value
A.time-delay protection
B.short-circuit protection
C.short duration surge protection
D.sustained overload protection
A.a magnetic operating coil
B.normally open line contacts
C.thermal-overload protection
D.a momentary-contact start button
A.60
B.120
C.180
D.360
A.copper and antimony
B.steel and babbitt
C.aluminum or beryllium alloy
D.zinc or an alloy of tin and lead
最新試題
To proceed to the assistance of a ship in distress is()
Which of the following items don’t belong to dock repair works?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
() is not installed on the main switchboar.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The condensers located in various stages of a flash evaporator are cooled by()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()