A.Certificate of Inspection
B.Load line certificate
C.Certificate of Documentation
D.SOLAS Certificate
您可能感興趣的試卷
你可能感興趣的試題
A.SOLAS Certificate is issued
B.Load Line Certificate is renewed
C.classification society approval is issued
D.permanent Certificate of Inspection is issued
A.bridge
B.engineering control station
C.recreation and messrooms
D.fire control room
A.International Maritime Dangerous Goods Carried by Sea
B.International Code for the Construction and Equipment of Ships Carrying Gases in Bulk
C.International Convention for the Safety of Life at Sea
D.International Regulations for Preventing Collisions at Sea
A.in contrast to
B.in compliance with
C.the essence of
D.representing
A.bailer
B.sponge
C.whistle
D.fishing kit
最新試題
The size of wire rope is determined by the().
Serving is().
As you hold a piece of manila line vertically in front of you,the strands run from the lower left to the upper right.Which type of line is this().
In a married falls rig at the after end of a hatch,a boom is rigged in a fore and aft line through its heel.Stresses on the outboard guy will be LEAST if the guy is made fast at a point().
What equipment is customarily used when seamen are working on a stage rigged over the side of a vessel().
What best describes an anchor buoy().
An intermediate spring is().
Temporary Certificates of Inspection are effective until the().
When attempting to free an anchor jammed in the hawsepipe,the simplest method of freeing it may be().
At least()radar transponder shall be carried on each side of every cargo ship of 500 gross tonnage and upwards.