A.hot work permit
B.Certificate of Inspection
C.Safety of Life at Sea Certificate
D.station bill
您可能感興趣的試卷
你可能感興趣的試題
A.hot work permit
B.Certificate of Inspection
C.Safety of Life at Sea Certificate
D.Muster List
A.Load Line Certificate
B.SOLAS Certificate
C.Stability Letter
D.Certificate of Inspection
A. Load Line Certificate
B. Certificate of Inspection
C. Safety of Life at Sea Certificate
D. operations manual
A.Load Line Certificate
B.operations manual
C.Safety of Life at Sea Certificate
D.Certificate of Inspection
A.load line certificate
B.Operations Manual
C.Safety of Life at Sea Certificate
D.Certificate of Inspection
最新試題
What does the term end-for-end refer to in regard to a wire towing hawser().
In a married falls rig at the after end of a hatch,a boom is rigged in a fore and aft line through its heel.Stresses on the outboard guy will be LEAST if the guy is made fast at a point().
What are the two main types of stud link chain().
An intermediate spring is().
The Vessel is a()bulk carrier which is permitted to carry grain in bulk without requiring any fittings under the Rules of the 1974 International Safety of Life at Sea Convention.
The maximum number of passengers a Vessel may carry().
In the manufacture of wire rope,if the wires are shaped to conform to the curvature of the finished rope before they are laid up,the rope is called().
SOLAS is the abbreviation of().
The best method of protecting that portion of a fiber anchor line nearest the anchor from chafing on the bottom is by().
The size of wire rope is determined by the().