單項(xiàng)選擇題A motor enclosure which protects against falling liquids is classified as ()

A.waterproof
B.drip proof
C.spray tight
D.spray proof


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題Universal motors will operate on AC or DC current, and are generally found in ()

A.portable tools
B.large pump motors
C.turbo electric main motors
D.forced draft fans

2.單項(xiàng)選擇題An operational amplifier, as used in todays consoles, has a calculated gain of 5This means that when the input changes ()

A.5 volts, the output changes 10 volts
B.10 volts, the output changes 5 volts
C.2 volts, the output changes 10 volts
D.10 volts, the output changes 2 volts

3.單項(xiàng)選擇題Electrical failures in motors are caused by the breakdown of insulation, which may be caused by ()

A.penetration of moisture
B.accumulation of dirt
C.overheating
D.All of the above

5.單項(xiàng)選擇題Sparking at the brushes of a running motor could be an indication of ().

A.normal operation
B.a dirty commutator
C.increased brush capacity
D.water vapor absorption

最新試題

“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()

題型:?jiǎn)雾?xiàng)選擇題

Engine parameters shall be corresponded to NOx Technical Files. This is required by ()

題型:?jiǎn)雾?xiàng)選擇題

One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()

題型:?jiǎn)雾?xiàng)選擇題

The ISPS Code consists of a mandatory section-Part A, which shows()

題型:?jiǎn)雾?xiàng)選擇題

For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()

題型:?jiǎn)雾?xiàng)選擇題

By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()

題型:?jiǎn)雾?xiàng)選擇題

Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()

題型:?jiǎn)雾?xiàng)選擇題

Diesel engine air start system check valves are opened by ()

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

Which of the following items don’t belong to dock repair works?()

題型:?jiǎn)雾?xiàng)選擇題