A.week
B.2 weeks
C.month
D.3 months
您可能感興趣的試卷
你可能感興趣的試題
A.De-energize the applicable switchboard bus
B.Bypass the interlocks
C.Secure and tag the supply circuit breaker in the open position
D.Station a man at the circuit supply switch
A.Wear rubber gloves and boots
B.Use only approved non-conducting tools
C.Ground the case of the machine before beginning any repairs
D.Open the supply circuits and tag the switches
A.electromagnetic field, revolving armature type
B.electromagnetic field, oscillatory armature type
C.armature, oscillatory electromagnet field type
D.armature, rotating electromagnetic field type
A.The breaker should be closed when one synchronizing lamp is dark and the other is bright
B.The breaker should be closed when both synchronizing lamps are bright
C.The frequency meter should be used to determine that the incoming alternator frequency is slightly higher than the bus
D.A portable phase sequence indicator must be used to verify the information from the lamps
A.100kw
B.400kw
C.500kw
D.600kw
最新試題
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
To proceed to the assistance of a ship in distress is()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Cold weather starting of a diesel engine may be made easier by()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Using a file without a handle may result in ()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.