A.slowly carried away
B.carried out with a period of delay
C.promptly carried out
D.paid by the captain
您可能感興趣的試卷
你可能感興趣的試題
A.automatically controlled
B.continuously manned
C.off power
D.none of the above is true
A.noted by the bridge officer
B.told by last duty engineer
C.observed
D.in the instruction manual
A.the chief engineer must be informed at first
B.the captain must be informed at first
C.it must be taken by the duty engineer
D.the generator engine must be stopped
A.captain
B.chief engineer
C.chief officer
D.chief motorman
A.Constant inspection
B.Keeping constant load
C.Remaining constant temperature
D.Varying speed
最新試題
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Diesel engine air start system check valves are opened by ()
If separating effect is not good, which measure should be taken ()
To proceed to the assistance of a ship in distress is()
Cold weather starting of a diesel engine may be made easier by()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The ISPS Code consists of a mandatory section-Part A, which shows()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.