A.bedding
B.pipe insulation
C.paint
D.a generator
您可能感興趣的試卷
你可能感興趣的試題
A.engine room bilges
B.main switchboard
C.paint locker
D.rag bin
A.only if fixed containment is not used
B.only if portable containment is not used
C.only if fixed containment drains are open
D.whenever the vessel is being bunkered
A.plugging all scuppers and drains
B.placing floating booms around the ship
C.regularly emptying all drip pans
D.thoroughly draining all bunkering hoses
A.wash down the area immediately with a fire hose
B.wash down the area with kerosene
C.cover the area with absorbent material
D.cover the area with foam
A.transmitting the heat of a fire through the ship s metal
B.burning liquids flowing into another space
C.heated gases flowing through ventilation systems
D.the transfer of heat across an unobstructed space
最新試題
If separating effect is not good, which measure should be taken ()
() is not installed on the main switchboar.
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The ISPS Code consists of a mandatory section-Part A, which shows()
Which of the following items don’t belong to dock repair works?()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Under MARPOL Code the ship to which it applies has to carry ()