A.home port
B.operators name of record
C.official number
D.masters name
您可能感興趣的試卷
你可能感興趣的試題
A.vessels logbook
B.vessel s documentation
C.muster list
D.Certificate of Inspection
A.a blanket of bubbles formed on the surface of the fire
B.smothering
C.cooling
D.isolating the heat from the fuel
A.5 seconds
B.10 seconds
C.15 seconds
D.20 seconds
A.Records for ground garbage disposal are not required when disposal into the sea occurs more than 25 miles offshore
B.Discharging or transfer of garbage while in port to a shore facility must he recorded
C.Maintaining records for the incineration of garbage aboard ship is not required
D.The recording of garbage disposal should include the approximate weight
A.damage control plan for isolating fire main valves
B.list of machinery space operation items
C.complete classification of hazardous materials
D.detailed listing of all organizations to call in the event of an accidental oil spill
最新試題
() is not installed on the main switchboar.
The ISPS Code consists of a mandatory section-Part A, which shows()
Using a file without a handle may result in ()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
The shipboard oil pollution emergency plan will be invalid after ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
If separating effect is not good, which measure should be taken ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Cold weather starting of a diesel engine may be made easier by()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()