A.More than six short blasts and one long blast on the whistle
B.Continuous blast of the ships whistle for a period of not less than 10 seconds supplemented by the same signal on the general alarm
C.Three short blasts of the whistle supplemented by the same signal on the general alarm
D.More than six short blasts and one long blast on the whistle supplemented by the same signal on the general alarm
您可能感興趣的試卷
你可能感興趣的試題
A.mechanical foam
B.chemical foam
C.carbon dioxide
D.soda acid
A.Dry chemical
B.Halon
C.Low velocity fog
D.Steam
A.abandon ship
B.dismissal from drills
C.fire and emergency
D.lower lifeboats
A.6 short blasts and 1 long blast
B.long blast mare than 6 short blasts
C.more than 6 short blasts and 1 long blast
D.1 long blast of at least 10 seconds
A.remain in the vicinity of the vessel
B.head for the closest land
C.head for the closest sea-lanes
D.get a majority opinion
最新試題
() is not installed on the main switchboar.
Under MARPOL Code the ship to which it applies has to carry ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The cetane rating of diesel fuel is an indication of the ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()