A.when the remaining charge volume is less than 90 percent of the required VOLUME
B.at each inspection for certification
C.at each annual inspection
D.when the weight loss exceeds 10% of weight of charge
您可能感興趣的試卷
你可能感興趣的試題
A.welding brackets across both ends of the crack
B.chipping out and slot welding the entire crack
C.drilling a hole at each end of the crack
D.cutting a square notch at each end of the crack
A.breaking the fire chemical chain reaction
B.smothering
C.cooling
D.isolating the heat from the fuel
A.quantity of fuel to be received
B.flash point of the fuel as it is received
C.fuel temperature as it is received
D.viscosity of the fuel being received
A.close the static leg filling valve
B.close the overflow tank falling valve
C.reduce the fuel oil pumping rate
D.stop the fuel oil pumping operation
A.The pressure-vacuum relief valve should be reset
B.The tanks should be made seaworthy to prevent contamination
C.The tanks should be sounded to make sure the levels are not rising
D.The tanks should be marked with a bull stamp on the manifold filling valve
最新試題
The treatment of the fuel oils involves storage, heating, filtering and()
The shipboard oil pollution emergency plan will be invalid after ()
Which of the following items don’t belong to dock repair works?()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
If separating effect is not good, which measure should be taken ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Cold weather starting of a diesel engine may be made easier by()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()