單項(xiàng)選擇題After the order “()” is given, the air system is shut down, the turning gear put in, all drains and indicator cocks opened, and the cooling water and lubricating oil systems kept running.

A.Stand-by Engine
B.Stop Engine
C.Finished With Engine
D.Dead Slow Ahead


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題For vessels with (), the meaning of the order would include the combination of pitch and revolutions as indicated in ships orders.

A.fixed pitch propellers
B.uncontrollable pitch propeller
C.constant pitch propellers
D.variable pitch propellers

2.單項(xiàng)選擇題The order “Bow thrust stop” means “()”.

A.Bow thrust full to pert
B.Bow thrust full to starboard
C.No bow thrust revolutions
D.No stern thrust revolutions

3.單項(xiàng)選擇題“Movement of engine no longer required” means “()”.

A.Stop Engine
B.No Engine Revolutions
C.Stand-by Engine
D.Finished With Engine

4.單項(xiàng)選擇題The order “()” means “Maximum maneuvering engine revolution for ahead propulsion”.

A.Full Ahead
B.Half Ahead
C.Full Astern
D.Half Astern

5.單項(xiàng)選擇題The trim of a vessel is the ().

A.value of the mean draft
B.degree of list
C.amount of roll
D.difference in fore and aft drafts

最新試題

() is not installed on the main switchboar.

題型:?jiǎn)雾?xiàng)選擇題

To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()

題型:?jiǎn)雾?xiàng)選擇題

By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()

題型:?jiǎn)雾?xiàng)選擇題

A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()

題型:?jiǎn)雾?xiàng)選擇題

As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()

題型:?jiǎn)雾?xiàng)選擇題

()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.

題型:?jiǎn)雾?xiàng)選擇題

Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()

題型:?jiǎn)雾?xiàng)選擇題

The cetane rating of diesel fuel is an indication of the ()

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

Under MARPOL Code the ship to which it applies has to carry ()

題型:?jiǎn)雾?xiàng)選擇題