A.clean anchor chain as it's hauled in
B.recover anchors which have lost their buoys
C.run and retrieve anchors
D.prepare anchor chain for inspection
您可能感興趣的試卷
你可能感興趣的試題
A.can be released while under strain
B.is used for boat falls
C.is used for extra heavy loads
D.is used for light loads only
A.pike pole
B.jack staff
C.line rod
D.hooker
A.quarter line
B.back line
C.peg line
D.jockey line
A.backing wire
B.scissor wire
C.face wire
D.breast wire
A.pelican hook
B.connecting link
C.shackle
D.retaining hook
最新試題
A six-strand composite rope made up of alternate fiber and wire strands around a fiber core is called().
Please tell the stevedores to load the cargo()according to the respective figures.
In the stowage of deck cargo,cribbing is().
The shippers to load trucks and heavy cargo,and also to supply all necessary materials for lashing.The expenses will be charged to()account.
To reduce stress on the towing hawser when towing astern (ocean tow),the hawser should be ().
Regulations concerning the stowage,lashing,and securing of timber deck cargoes aboard general cargo vessels may be found in the().
A spring line is a().
In order to correctly open a new coil of manila line,you should().
I’ve already put down the remarks DECK CARGO()SHIPPER’S RISK in the Shipping Order.
The release of the attached ship can()only by provision of bail,usually a very large sum.