A.the engineer officer in charge of watch
B.the deck officer in charge of watch
C.the master
D.the chief mate
您可能感興趣的試卷
你可能感興趣的試題
A.3 years after making the first entry
B.2 years after the last entry
C.3 months after last entry
D.3 years after the last entry
A.port state control
B.flag state control
C.fire and boat drill
D.Safety inspection
A.additional
B.permanent
C.temporary
D.long
A.detergent
B.de-oiling
C.defrosting
D.demulsifying
A.defrosting
B.de-oiling
C.demulsifying
D.dehumidifying
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
If separating effect is not good, which measure should be taken ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
The condensers located in various stages of a flash evaporator are cooled by()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
The ISPS Code consists of a mandatory section-Part A, which shows()
To proceed to the assistance of a ship in distress is()
The main purpose of port State control is not to()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()