A.high pressure alarm
B.fire alarm
C.extinguishers
D.fusible plugs
您可能感興趣的試卷
你可能感興趣的試題
A.filled
B.evacuated
C.compressed
D.charged
A.greater
B.smaller
C.better
D.worse
A.hydraulic head
B.static head
C.heat energy
D.steam
A.a liquid
B.a pressure
C.a temperature
D.none of the above
A.a priming device
B.a discharge branch
C.a filter
D.a suction valve
最新試題
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Under MARPOL Code the ship to which it applies has to carry ()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Diesel engine air start system check valves are opened by ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The ISPS Code consists of a mandatory section-Part A, which shows()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()