A.spreading
B.proceeding
C.bounding for
D.going to
您可能感興趣的試卷
你可能感興趣的試題
A.off
B.reach
C.from
D.of
A.implemented
B.implied
C.impossible
D.improper
A.difference between the vessel's speed through the water at any instant and the new speed ordered on the telegraph
B.distance the vessel has actually run through the water since a change of speed was ordered
C.distance the vessel will run between taking action to stop her and being stationary in the water
D.speed at which a vessel should proceed to ensure that she will run a predetermined distance,once her engines have been stopped
A.one short blast
B.one prolonged blast
C.not less than five short blasts
D.not less than five prolonged blasts
A.clean report
B.serious deficiencies
C.clear ground
D.detention report
最新試題
You are approaching a vertical lift bridge.You know the span is fully open when().
Which instrument is used to predict the approach of a low pressure system().
When attempting an upstream landing while pushing empty barges ahead in a hard onshore wind,the approach is best made().
The rules state that vessels may depart from the requirements of the Rules when().
The term of Landfall means().
The term of Landfall means().
Which effect does speed through the water have on a vessel which is underway in shallow water ().
A vessel shall not().
When steering a tow downstream around the shape of a sand bar,and staying on the proper side of the buoys,an operator should be cautious of().
The court has the power to()the time for commencing arbitration proceedings if it is of the opinion that in the circumstances of the case undue hardship would otherwise be caused.