單項選擇題An exhaust gas bypass is installed on a waste heat boiler in order to ().

A.bypass exhaust gas at high loads to prevent excessive back pressure
B.bypass a portion of the exhaust gas at peak loads for better efficiency
C.recycle exhaust gas to the turbocharger
D.minimize moisture condensation in the boiler gas passages at low loads


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題Which of the following actions should be taken if during a routine maintenance inspection of a centrifugal pump, localized scoring on a pump shaft sleeve is detected?()

A.Correct the cause of the scoring and repair the sleeve or replace with a new one
B.Reassemble the unit and provide more water leak off for proper lubrication
C.Check for parallel alignment of the sleeve radial faces to the sleeve bores
D.Reassemble the unit and adjust the governor to obtain a slower speed

3.單項選擇題For the proper control of the air temperature in an air conditioning system using chilled water circulation, which of the listed conditions should remain constant regardless of load changes?()

A.Chilled water system supply temperature
B.Chilled water system return temperature
C.Compressor discharge temperature
D.Compressor suction pressure

5.單項選擇題The operating water is supplied under the ()of an oil separator.

A.sliding bowl bottom
B.bowl hood
C.bowl
D.filter units