A.has finished
B.finishes
C.had finished
D.would finish
您可能感興趣的試卷
你可能感興趣的試題
A.to repair;to renew
B.repairing;be renewed
C.repairing;will be renewed
D.to repair;to be renewed
A.Care to be not taken
B.Care not to be taken
C.Care to be taken not
D.Not care to be taken
A.claim to
B.claiming to
C.claim for
D.claiming for
A.Heats
B.Heating
C.To heat
D.Heated
A.not to go against
B.don’t go against
C.not go to against
D.to not go against
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
If separating effect is not good, which measure should be taken ()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
() is not installed on the main switchboar.