A.do
B.to do
C.done
D.doing
您可能感興趣的試卷
你可能感興趣的試題
A.update
B.finish
C.outdated
D.expire
A.Any surge occurs
B.Any surge occurred
C.Should any surge occur
D.Should any surge occurring
A.Were there loss of energy by friction
B.Since there be loss of energy by friction
C.Were there no loss of energy by friction
D.Should be no loss of energy by friction
A.The smoother;the greater
B.Smoother;less
C.The rougher;the greater
D.rougher;greater
A.in which
B.on which
C.by which
D.from which
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The condensers located in various stages of a flash evaporator are cooled by()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish