A.Ours
B.Ours ship
C.Our’s ship
D.Our’s
您可能感興趣的試卷
你可能感興趣的試題
A.sparking being taking place
B.to spark taking place
C.sparking to be taken place
D.sparking taking place
A.is due to
B.dues to
C.is because
D.is for
A.send
B.sends
C.was sent
D.were sent
A.any problem
B.some problem
C.any problems
D.some problems
A.did not interrupt
B.were not interrupted
C.had not interrupted
D.had not been interrupted
最新試題
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
If separating effect is not good, which measure should be taken ()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.