單項選擇題The“person in the phrase ”to designate a person or persons ashore having direct access to the highest level of management” refers to ().

A.the manager of the shipping company
B.the master of the ship
C.the designated person on board ship
D.the designated person ashore


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題()conveys a signal of desired rudder angle from the bridge and activates the power unit and transmission system unit the desired angle is reached.

A.The control equipment
B.The power unit
C.The transmission system
D.The follow-up mechanism

2.單項選擇題In the constant-tension mooring, the mooring lines holding the ship to the pier will maintain a constant tension even with changes in tide or ship’s draft, ().

A.without the necessity of manually adjusting the lines
B.without the necessity of automatically adjusting the lines
C.with the necessity of manually adjusting the lines
D.with the un-necessity of automatically adjusting the lines

3.單項選擇題()is put into use in the late years to maintain a preset tension in a mooring line after a ship has been tied up at a pier.

A.The large-tension mooring
B.The small-tension mooring
C.The variable-tension mooring
D.The constant-tension mooring

4.單項選擇題However fast or slow the combustion rate, it is still a () between carbon, hydrogen, sulphur and oxygen that releases heat.

A.physical deformation
B.state exchange
C.chemical reaction
D.coalescence