A.Failure of proper operation of propulsion and other essential machinery, as well as electrical installation
B.Failure of the proper operation of the main and auxiliary steering gear
C.Failure of engineering watch arrangements to confirm to the requirements specified for the ship by Administration
D.Failure of the proper operation of emergency generator, lighting, batteries and switches
您可能感興趣的試卷
你可能感興趣的試題
A.trim
B.lean
C.draft
D.tonnage
A.back of the vessel
B.the middle portion of a ship
C.a backward movement of a vessel
D.across the ship, at right angles to the fore-and-aft centerline
A.One-hour notice
B.Dead slow ahead
C.Finished with engines
D.Half astern
A.dangerous
B.best
C.bad
D.important
A.Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired on the spot
B.Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired on the next port of call
C.Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired until the next stop
D.Any leaks in piping, propeller shaft, machinery, tanks, will have to be at least patched up
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
Diesel engine air start system check valves are opened by ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
To proceed to the assistance of a ship in distress is()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The condensers located in various stages of a flash evaporator are cooled by()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()