A.it is difficult for them to finish the job in time
B.difficult for them to finish the job in time
C.they have much difficulty to finish the job in time
D.that difficult for them to finish the job in time
您可能感興趣的試卷
你可能感興趣的試題
A.the third engineer
B.the PSCO
C.the surveyor
D.the chief engineer
A.missing valve hand wheels
B.dirty tank tops
C.a large number of temporary repairs
D.All of the above
A.the manager of the company
B.the surveyor of the Classification Society
C.the master of the vessel
D.the chief engineer of the vessel
A.the survival craft launching equipment have never been used
B.the pivot points are seized
C.the lashing or stowing of deck cargo is improper
D.All of the above signs are evident
A.The quantity of oil residues generated
B.The capacity of sludge and bilge water holding tank
C.The capacity of the oily water separator
D.All of the above
最新試題
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Under MARPOL Code the ship to which it applies has to carry ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
The treatment of the fuel oils involves storage, heating, filtering and()
() is not installed on the main switchboar.
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Using a file without a handle may result in ()