A.SOLAS 74
B.MARPOL 73/78
C.STCW 78/95
D.ISM Code
您可能感興趣的試卷
你可能感興趣的試題
A.the owner of the ship
B.the manager who assumes the responsibility for operation of the ship
C.the bareboat charterer
D.All of the above
A.physical state
B.temperature
C.atmospheric pressure
D.sensible pressure
A.it is difficult for them to finish the job in time
B.difficult for them to finish the job in time
C.they have much difficulty to finish the job in time
D.that difficult for them to finish the job in time
A.the third engineer
B.the PSCO
C.the surveyor
D.the chief engineer
A.missing valve hand wheels
B.dirty tank tops
C.a large number of temporary repairs
D.All of the above
最新試題
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The ISPS Code consists of a mandatory section-Part A, which shows()
The treatment of the fuel oils involves storage, heating, filtering and()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Under MARPOL Code the ship to which it applies has to carry ()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()