A.Send the wiper into the well with only a scoop and pail
B.Remove the bilge manifold valve and attempt to back flush the line
C.Simultaneously operate all available bilge pumps
D.It is only necessary to transfer half the contents of a drum of degreaser into the bilge well
您可能感興趣的試卷
你可能感興趣的試題
A.Send the wiper into the well with only a scoop and pail
B.Remove the bilge manifold valve and attempt to back flush the line
C.Simultaneously operate all available bilge pumps
D.It is only necessary to transfer half the contents of a drum of degreaser into the bilge well
A.surface fatigue
B.fretting corrosion
C.heavy overloading
D.gear misalignment
A.doing
B.make
C.turn
D.operating
A.why
B.which
C.in which
D.on which
A.until
B.not until
C.not before
D.not after
最新試題
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
The condensers located in various stages of a flash evaporator are cooled by()
If separating effect is not good, which measure should be taken ()
() is not installed on the main switchboar.
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The shipboard oil pollution emergency plan will be invalid after ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()