A.lining up the systems
B.topping off
C.starting delivery
D.connecting hoses and joints
您可能感興趣的試卷
你可能感興趣的試題
A.draft of the vessel
B.rate of delivery
C.communication with terminal personnel
D.observation of manifold valves
A.be safe if mixed with fresh water
B.prevent seasickness
C.promote urine excretion
D.protect against heat cramps
A.survivors in the water
B.food and water
C.land
D.bad weather
A.12 to 15 times per minute
B.18 to 20 times per minute
C.20 to 25 times per minute
D.as fast as possible
A.use the mouth-to-mouth method
B.clear airways
C.use rhythmic pressure method
D.know all approved methods
最新試題
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Using a file without a handle may result in ()
Under MARPOL Code the ship to which it applies has to carry ()
The treatment of the fuel oils involves storage, heating, filtering and()
The shipboard oil pollution emergency plan will be invalid after ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The ISPS Code consists of a mandatory section-Part A, which shows()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.