A.severe electrical storm
B.fire on the pier
C.fire on the ship
D.any of the above
您可能感興趣的試卷
你可能感興趣的試題
A.1% to 3%
B.1% to 2%
C.4%
D.2% to 4%
A.bunker at a normal rate
B.check for kinks in hose
C.close valves slowly
D.shut valves before topping off
A.lining up the systems
B.topping off
C.starting delivery
D.connecting hoses and joints
A.draft of the vessel
B.rate of delivery
C.communication with terminal personnel
D.observation of manifold valves
A.be safe if mixed with fresh water
B.prevent seasickness
C.promote urine excretion
D.protect against heat cramps
最新試題
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Diesel engine air start system check valves are opened by ()
The ISPS Code consists of a mandatory section-Part A, which shows()
The treatment of the fuel oils involves storage, heating, filtering and()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Under MARPOL Code the ship to which it applies has to carry ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Which of the following items don’t belong to dock repair works?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()