A.a broken shaft on the freshwater pump
B.an excessive accumulation of scale exchanger
C.an incorrect thermostatic element operating range
D.lube oil in the cooling water
您可能感興趣的試卷
你可能感興趣的試題
A.varying the pump discharge pressure
B.varying the pump return pressure
C.rotation of the pump plunger
D.rotation of the pump barrel
A.accumulator spring compressor
B.balance piston
C.compensating needle valve
D.proportional piston
A.speed droop
B.compensation
C.idle speed setting
D.load limit control
A.Large misalignments can be tolerated between the shaft and engine coupling
B.Slip is held to a minimum when reversing shaft rotation
C.Engine torsion vibrations to the driven shaft are eliminated
D.It aids in maintaining power factor
A.actuation
B.sensitivity
C.compensation
D.thrust shaft
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
The ISPS Code consists of a mandatory section-Part A, which shows()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The cetane rating of diesel fuel is an indication of the ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
The condensers located in various stages of a flash evaporator are cooled by()
Which of the following items don’t belong to dock repair works?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish