單項(xiàng)選擇題The plunger in a jerk pump is rotated until the release port is uncoveredIf the port remains uncovered all of the time, which of the listed operations will occur?()

A.No fuel will be delivered
B.The maximum effective stroke will be attained
C.The fuel delivered to the cylinder will be excessive
D.The injection nozzle will overheat and carbonize


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題If the compensating needle valve of a hydraulic governor is opened more than necessary the governor will ()

A.have a larger than normal dead band
B.produce excessive speed response to a load change
C.respond slowly to any change in engine load
D.stabilize engine speed at the new governor setting

2.單項(xiàng)選擇題The double bottom in a vessel is a space comprised of ()

A.plating forming the engine room tank top
B.doubler plating installed over the flat keel plate
C.a watertight boundary formed by the inner bottom
D.compartments between the inner and outer bottoms

3.單項(xiàng)選擇題The lowest temperature at which fuel combustion becomes self-sustaining in the presence of a source of ignition, is defined as the ()

A.auto-ignition point
B.flash point
C.burning temperature
D.fire point

4.單項(xiàng)選擇題Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()

A.double bottom fuel oil tank temperature
B.heater supply steam flow
C.pressure of the fuel supplied to the burners
D.attemperator steam flow in the heater discharge circuit

5.單項(xiàng)選擇題The construction of the main propulsion engine lube oil sump should ()

A.have no plating joints of 90
B.retain the lube oil as long as possible before it recirculates through the system
C.provided drain/return lines that are no greater than 24 inches from the pump suction
D.be provided with only a perfectly horizontal bottom

最新試題

Which of the following items don’t belong to dock repair works?()

題型:?jiǎn)雾?xiàng)選擇題

For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()

題型:?jiǎn)雾?xiàng)選擇題

The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

題型:?jiǎn)雾?xiàng)選擇題

By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()

題型:?jiǎn)雾?xiàng)選擇題

Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()

題型:?jiǎn)雾?xiàng)選擇題

The cetane rating of diesel fuel is an indication of the ()

題型:?jiǎn)雾?xiàng)選擇題

The shipboard oil pollution emergency plan will be invalid after ()

題型:?jiǎn)雾?xiàng)選擇題

“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()

題型:?jiǎn)雾?xiàng)選擇題