A.5
B.3
C.2
D.1
您可能感興趣的試卷
你可能感興趣的試題
A.inform the captain for a further consideration, then perform it
B.inform the captain, and not perform it
C.stop the M/E immediately, and then inform the chief engineer
D.stop the M/E immediately, and then inform the captain
A.ISM code
B.ISPS code
C.IBC code
D.FSS code
A.the chief engineer officer
B.the master of the ship
C.the manager of the company
D.the Administration
A.SOLAS
B.MARPOL
C.STCW
D.Ballast Water convention
A.24 hours
B.2 hours
C.1 hours
D.15 minutes
最新試題
If separating effect is not good, which measure should be taken ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Cold weather starting of a diesel engine may be made easier by()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The cetane rating of diesel fuel is an indication of the ()
Which of the following items don’t belong to dock repair works?()
The main purpose of port State control is not to()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()