A.high oil pressure
B.excessive bearing end play
C.plugged oil control rings
D.engine overload
您可能感興趣的試卷
你可能感興趣的試題
A.leaking delivery valve
B.excessive bearing end play
C.plugged injector spray hole
D.increased plunger stroke
A.graphite packing
B.sealing compound
C.lubricating oil
D.gaskets
A.Decrease the air density
B.Increase the exhaust temperature
C.Decrease the lube oil temperature
D.Increase the air density
A.Clogged oil pump suction screens
B.Increased oil operating temperatures
C.Sticking piston rings
D.All of the above
A.improper fuel rack positing
B.lengthy exhaust valve duration
C.extend operation at light load
D.excessively early injection timing
最新試題
Which of the following items don’t belong to dock repair works?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Diesel engine air start system check valves are opened by ()
The shipboard oil pollution emergency plan will be invalid after ()
The ISPS Code consists of a mandatory section-Part A, which shows()
Under MARPOL Code the ship to which it applies has to carry ()