A.a leaking seal ring
B.heat transfer from exhaust valves
C.restricted cooling passages
D.overheated intake valves
您可能感興趣的試卷
你可能感興趣的試題
A.top of the ring groove
B.back of the ring groove
C.bottom of the ring groove
D.piston ring end clearance
A.oil rings only
B.compression and scraper rings
C.cylinder liner sealings
D.cylinder liner ring grooves
A.wrist pin bushings
B.compression rings
C.cylinder liner seals
D.cylinder liner sealing ring
A.Gasoline
B.Water
C.Lubricating oil
D.sulphur compounds
A.back clearance
B.side clearance
C.gap clearance
D.taper clearance
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
If separating effect is not good, which measure should be taken ()
The treatment of the fuel oils involves storage, heating, filtering and()
To proceed to the assistance of a ship in distress is()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Under MARPOL Code the ship to which it applies has to carry ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()