單項選擇題Every new crude oil tanker of 20000 tons deadweight and above shall be fitted with a cargo tank cleaning system using().

A.hot water
B.cold water
C.chemicals
D.crude oil washing


您可能感興趣的試卷

你可能感興趣的試題

3.單項選擇題Each fireman’s outfit and its spare equipment on a tanker must be stowed in a(n)().

A.locked cabinet in the machinery space
B.unlocked cabinet in the machinery space
C.separate and accessible location
D.location near a fire hydrant

4.單項選擇題Each fire pump on a tanker must have a pressure gauge located at().

A.the pump discharge
B.the manifold connection
C.each fire station discharge
D.the pump station

5.單項選擇題During oil transfer operations,who is responsible for ensuring that the posted transfer procedures are followed?().

A.The designated person in charge
B.The tankerman
C.The senior able seaman
D.The oiler